Home‎ > ‎Crew 136‎ > ‎

220-EVAReport

02/20/2014
Olivier Gobert
Eva Number:
5
Eva Date:
02/20/2014
Time Slot:
earlyPM
Purpose:
Data collecting on the river of the streambed project. Sample collecting of minerals for the UV project.
Narrative:
The EVA started at 14:30. The way to the first spot was a new road straight north. This road goes to the west of the hill at the north of the MDRS. The first spot was reached at 15:00. The data collecting went well and quickly. The second spot was reached at 15:45. The mineral collecting went well but was too short in time. However, the spot looks really promising and we expect a lot of the next EVA. The weather conditions were excellent for the work and the team was really satisfied of this EVA. The EVA ended at 16:45
Eva Depart Time:
14:30
Check In Time One:

Check In One E:

Check In One N:

Check In Note One:

Check In Time Two:

Check In East Two:

Check In Note Two:

Check In Time Three:

Check In East Three:

Check In North Three:

Check In Note Three:

Check In Time Four:

Check In East Four:

Check In North Four:

Check In Note Four:

Eva Return Time:
16:45
Wp1 E:
518745
Wp1 N:
4251741
Waypoint1arrive Time:
15:00
Eva W P1depart Time:
15:30
Wp1 Find:
data for the streambed project
Wp2 E:
518598
Wp2 N:
4252685
Eva W P2arrive Time:
15:45
Eva W P2depart Time:
16:15
Wp2 Find:
samples of minerals
Wp3 E:

Wp3 N:

Eva W P3arrive Time:

Eva W P3depart Time:

Wp3 Find:

Wp4 E:

Wp4 N:

Eva W P4arrive Time:

Eva W P4depart Time:

Waypoint Four Finding:

Waypoint Five Easting:

Waypoint Five Northing:

Waypoint Five Arrive Time:

Waypoint Five Depart Time:

Waypoint Five Findings: