Home‎ > ‎Crew 143‎ > ‎

1115-EngineeringReport

Engineering Report
11/15/2014
Prepared by Ian Silversides

Arrived at MDRS. 
Received engineering briefing on the functioning of systems: heating downstairs, heating upstairs,
water heater, indoor water pump, outdoor water pump, location of propane tank and diesel tank.
Received briefing on ATVs and were able to start up 3/4  blue and 1/1 red. Blue 3 causing problems.
Will report to DG shortly. 

The hab is warm and clean. It already feels like home!

Trailer water tank: 50%
Propane tank : 30%
Generator diesel : NA