Home‎ > ‎Crew 147‎ > ‎

117-EngineeringReport

Engineering Report
01/17/2015
Rebeca Rodriguez

Resources:
Diesel: less than ¾
Propane: 37%
Static tank: Full

Water:
Today the water supply ship arrived. The ship filled up the static 
tank and at that time the loft tank was filled.

Water temperature:
The hot water has still not been attained. DG checked the water heater 
and has deemed it non-operational. He has proposed for it to
be replaced.

ATV:
ATV 3 was used during today’s EVA. The ATV performed well throughout 
the excursion. The proposed check on ATV 5 will be
performed on an upcoming EVA.

----------------

EngSupWater Report
01/17/2015
Rebeca Rodriguez
Water Logging Date And Time:
1/17/2015 1:30 PM
Static Tank Level Before:
85
Water Meter Reading Before:
901893
Loft Tank Level Before:
25
Water Used During Fill:
no
Water Meter Reading After:
902338
Loft Tank Level After:
50
Static Tank Level After:
95
Static Tank Refilled:
yes
Trailer Tank Level Before:
140
Trailer Tank Level After:
15
Final Static Tank Level: