Engineering Report
01/22/2015
Rebeca Rodriguez

Resources:
Diesel: 55%
Propane: 31%
Static tank: 38 cm from the top

Water:
We attempted to fill the loft tank before the EVA at 10am, but water did not flow from the static tank. We believe this might have
been to frozen water in the pipes. Later in the day, we were able to fill the loft tank without any issues. The loft tank was filled once
more in the afternoon.

ATV:
During today’s EVA, ATV’s 1,3, and 4 performed nominal. We are awaiting additional fuel.