Home‎ > ‎Crew 148‎ > ‎

124-EngineeringReport

Engineering Report
01/24/2015
Duarte Sousa

Resources:
Diesel- 50%
Propane- 30%

Water management:
Loft tank was filled once in the morning and once in the evening.
Static tank was refilled from the Trailer Tank. Status: 2cm from the top

Waste management:
There are 5 bags on the trailer ready to be taken

ATV:
We are awaiting fuel for the ATV's.