Home‎ > ‎Crew 148‎ > ‎

202-EVAReport

Eva Report
02/02/2015
Lucie Poulet
Eva Number:
7bis
Eva Date:
2015-02-02
Time Slot:
laterPM
Purpose:
Engineering EVA.
Filling the static pump when plugged to a different electrical outlet.
Narrative:
The crew was composed of our crew engineer Duarte and our crew scientist Nuno. They existed the airlock at 18:10 and proceeded with static tank refilled. The EVA lasted a total of 28 min from start of depressurization to end of repressurization. Filling the tank was successful, the pump worked.
Eva Depart Time:
18:10
Check In Time One:
18:14
Check In One E:
518230
Check In One N:
4250725
Check In Note One:
Start refilling of the static tank
Check In Time Two:
18:25
Check In East Two:
518230
Check In Note Two:
Tank full
Check In Time Three:

Check In East Three:

Check In North Three:

Check In Note Three:

Check In Time Four:

Check In East Four:

Check In North Four:

Check In Note Four:

Eva Return Time:
18:27
Wp1 E:

Wp1 N:

Waypoint1arrive Time:

Eva W P1depart Time:

Wp1 Find:

Wp2 E:

Wp2 N:

Eva W P2arrive Time:

Eva W P2depart Time:

Wp2 Find:

Wp3 E:

Wp3 N:

Eva W P3arrive Time:

Eva W P3depart Time:

Wp3 Find:

Wp4 E:

Wp4 N:

Eva W P4arrive Time:

Eva W P4depart Time:

Waypoint Four Finding:

Waypoint Five Easting:

Waypoint Five Northing:

Waypoint Five Arrive Time:

Waypoint Five Depart Time:

Waypoint Five Findings: