Home‎ > ‎Crew 155‎ > ‎

1103-EngineeringReport

--------------------------------------------------------------------------------
Engineering Report
--------------------------------------------------------------------------------
Date: 03 November 2015
 
Crew Engineer Name: Stergios Palpanis
 
Diesel – 30%
 
Propane – 40% (gauge at the top of the tank)
 
Gasoline (5 Gal for ATV) – 50%
 
Water (trailer) – 65cm from the bottom  
 
Water (static) – 47cm from the top
 
Trailer to Static Pump used - No
 
Water (loft) – 35 gallons
 
Static to Loft Pump used - Yes
 
Water Meter 100.300,70 Gallons on arrival (28/10/2015)
 
Atv # Oil Checked: Oil indicators are checked
 
Atv # Fuel Used Gals: 2.5 gallons
 
Atv # Tires Status: Good condition (arrival)
 
Atv # Hours Used Day: 2 Atv for half hour (used during filming)
 
Atv # Notes And Comments:  No Comments
 
Summary of Engineering activities: A film crew was on the MDRS filming for a show so no engineering works took place.
 
Questions and Concerns to Mission Support: