Engineering Report

--------------------------------------------------------------------------------

Date: 08 November 2015


Crew Engineer Name: Joshua Timpe


Diesel – 22% 


Propane – 40% (gauge at the top of the tank)


Gasoline (5 Gal for ATV) – 5% (needs refill)


Water (trailer) – 9 cm from the bottom (needs refill)  


Water (static) – 57 cm from the top 


Trailer to Static Pump used - No


Water (loft) – 42 gallons


Static to Loft Pump used - Yes


Water Meter 101.078.470 Gallons on arrival (08/11/2015)


Atv # Oil Checked: Oil indicators are checked 


Atv # Fuel Used Gals: 4.75 gallons (since last refill of 5 gal tank)


Atv # Tires Status: Good condition (arrival)


Atv # Hours Used Day: 4 Atv for 2 hour (used for survey of surrounding terrain)


Atv # Notes And Comments:  Gasoline Tank for ATVs and Trailer water tank both need refill


Summary of Engineering activities:

    Checked fuel stores for Hab and ATVs
    Checked water stores
    Started Central Heater for Hab


Questions and Concerns to Mission Support: Is there a water gauge specifically for the shower?