Home‎ > ‎Crew 156‎ > ‎

1110-EngineeringReport

--------------------------------------------------------------------------------

Engineering Report

--------------------------------------------------------------------------------

Date: 10 November 2015 


Crew Engineer Name: Joshua Timpe


Diesel – 22%  


Propane – 38% (gauge at the top of the tank)


Gasoline (5 Gal for ATV) – 0% (needs refill)


Water (trailer) – 9 cm from the bottom (needs refill)   


Water (static) – 70 cm from the top  


Trailer to Static Pump used - No


Water (loft) – 40 gallons 


Static to Loft Pump used - Yes


Water Meter 101.078.470 Gallons on arrival (08/11/2015)


Atv # Oil Checked: Oil indicators are checked  


Atv # Fuel Used Gals: 5.0 gallons (since last refill of 5 gal tank)


Atv # Tires Status: Good condition (arrival) 


Atv # Hours Used Day: 4 Atv for 1.0 hour (used for EVA) 


Atv # Notes And Comments:  Gasoline Tank for ATVs and Trailer water tank both still need refill. Trash needs to be removed.  Unable start ATV#5 today, request reevaluation.  Only 2 working radio headphones, third headphone works intermittently.   


Summary of Engineering activities: 

  • Checked fuel stores for Hab and ATVs
  • Checked water stores
  • Attempted to start ATV#5 (spare that was dropped off yesterday)


Questions and Concerns to Mission Support: Is there an expected time for refill of gasoline and water?