Engineering Report

 

 

Date: Dec 4th 2015

 

Crew Engineer Name: Ilaria

 

Diesel –70%

 

Propane –65 %

 

Gasoline (5 Gallon containers for ATV) –  

 

Water (trailer) measured in cm from the bottom–   19 cm from the top

 

Water (static) measured in cm from the top – 39 cm

 

Trailer to Static Pump used – no

 

Water (loft) – 7

 

Static to Loft Pump used - yes

 

Water Meter:

 

Atv # Oil Checked:  0

 

Atv # Fuel Used Gals:  0

 

Atv # Tires Status:  0

 

Atv # Hours Used Day: 0

 

Atv # Notes And Comments:  0

 

Summary of Engineering activities:

·         The walkie-talkie number 4 is working. It has a lot of interference in sending when is using with GPS.

 

Questions and Concerns to Mission Support:

·