Engineering Report
 
 
Date: Dec 6th 2015
 
Crew Engineer Name: Ilaria
 
Diesel –70%
 
Propane –57 %
 
Gasoline (5 Gallon containers for ATV) –  5
 
Water (trailer) measured in cm from the bottom–   19 cm from the top
 
Water (static) measured in cm from the top – 29.5 cm
 
Trailer to Static Pump used – no
 
Water (loft) – 12
 
Static to Loft Pump used - yes
 
Water Meter:
 
Atv # Oil Checked:  0
 
Atv # Fuel Used Gals:  0
 
Atv # Tires Status:  0
 
Atv # Hours Used Day: 0
 
Atv # Notes And Comments:  0
 
Summary of Engineering activities:

We are running out kitchen paper and paper napkins. We can use toilet paper to replace the towels but it wont be enough until the end of the mission.
The garbage outside (3 bins) are full and we are going to leave the future garbage out of the bins ( I am a little bit worry for the animals around).
One of the member of the HBO used the toilet without following the instruction. Hence the toilet was blocked until this afternoon.The toilet was plounged but it is not flushing as it is supposed to do. I will keep you post on that.
 