Engineering Report
 
 
Date: Dec 14th 2015
 
Crew Engineer Name: Chiara Cocchiara
 
Diesel – 64%
 
Propane –50 %
 
Gasoline (5 Gallon containers for ATV) –  5
 
Water (trailer) measured in cm from the bottom– 15.5 cm
 
Water (static) measured in cm from the top – 33 cm
 
Trailer to Static Pump used – no
 
Water (loft) – 12
 
Static to Loft Pump used - yes
 
Water Meter:
 
Atv # Oil Checked:  0
 
Atv # Fuel Used Gals:  0
 
Atv # Tires Status:  0
 
Atv # Hours Used Day: 0
 
Atv # Notes And Comments:  0
 
Summary of Engineering activities:
All Engineering checks are done and show correct behaviour for the Hab activities.

Questions and Concerns to Mission Support:
When trying the ATVs, it was noticed that the the ATV with number 3 (key number) smoked. There seems to be a few problems. 
Among the major ones we noted the breaks are permanently breaking the wheel . And also the air filter below the seat is wet and needs cleaning. 
We require support for this one and for the already before reported ATV with number 2 , that is missing the battery.


-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=

SOL2
Chiara Cocchiara

NO EVAs done today.