Home‎ > ‎Crew 159‎ > ‎

1215-EngineeringReport

Engineering Report
 
 
Date: Dec 15th 2015
 
Crew Engineer Name: Chiara Cocchiara
 
Diesel – 61%
 
Propane –50 %
 
Gasoline (5 Gallon containers for ATV) –  5
 
Water (trailer) measured in cm from the top of the water to the top of the tank – 15.5 cm
 
Water (static) measured in cm from the bottom of the tank to the top of the water– 31 cm
 
Trailer to Static Pump used – no
 
Water (loft) – 12
 
Static to Loft Pump used - yes
 
Water Meter:
 
Atv # Oil Checked:  0
 
Atv # Fuel Used Gals:  0
 
Atv # Tires Status:  0
 
Atv # Hours Used Day: 0
 
Atv # Notes And Comments:  0
 
Summary of Engineering activities:

Everything looks okay.
 
Questions and Concerns to Mission Support:

No major concerns. Just noticed that the different spacesuit pump different amount of air inside the helmet.