Engineering Report
 
 
Date: Dec 21th 2015
 
Crew Engineer Name: Chiara Cocchiara
 
Diesel: 46%
 
Propane: 55%
 
Gasoline (5 Gallon containers for ATV): 5
 
Water (trailer) measured in cm from the bottom: 15.5 cm
 
Water (static) measured in cm from the top: 28 cm
 
Trailer to Static Pump used: no
 
Water (loft): 11
 
Static to Loft Pump used - yes
 
Water Meter:
 
Atv # Oil Checked:  0
 
Atv # Fuel Used Gals:  1/3
 
Atv # Tires Status:  The ATV n.4 has the back left wheel that is wobbling a bit.
 
Atv # Hours Used Day: 1 hour
 
Atv # Notes And Comments:  0
 
Summary of Engineering activities:
Everything looks fine.
 

Questions and Concerns to Mission Support:
No particular questions or concerns. The only thing is that in the future maintenance of ATV, the back left wheel of ATV n.4 needs to be checked as it is wobbling a bit.
The numbering has been modified so now what is written in the ATV is consistent with the key numbers . To be precise now, ATV 1 and 3 are the ones working. Number 2 is the one without bettery, the 4 is the one with the other problems (air filter and brake).