Engineering report

Date: Dec 22nd 2015

Crew Engineer Name: Chiara Cocchiara

Diesel – 38 %

Propane –55 psi

Gasoline (5 Gallon containers for ATV) –  5

Water (trailer) measured in cm from the bottom– 15.5 cm

Water (static) measured in cm from the top – 28.5 cm

Trailer to Static Pump used – no

Water (loft) – 9

Static to Loft Pump used - yes

Water Meter:

Atv # Oil Checked:  0

Atv # Fuel Used Gals:  1/3

Atv # Tires Status:  0

Atv # Hours Used Day: 1 Hour

Atv # Notes And Comments:  0

Summary of Engineering activities:

                     Everything looks fine from the Engineering Checks       

Questions and Concerns to Mission Support:

                    Walkie Talkie number 4 seems to have some issues during communications. We hear a constant static noise.