SOL 2

ENGINEERING REPORT

Crew Engineer Name: MIKHAIL KHMELIK

Date: 11 January 2016

Diesel – 80%
Propane –29 PSI
Gasoline (3 Gallon containers for ATV) – 1 FULL, 1 HALF FULL
Water (trailer) measured in inches from the top– 0 from top and 30in form bottom
Water (static) measured in inches from the bottom – 27.5 IN
Trailer to Static Pump used – NO
Water (loft) – 9
Static to Loft Pump used – YES
Water Meter: 0103261.7
Atv # Oil Checked: YES, GOOD
Atv # Fuel Used Gals: ABOUT 0.5
Atv # Tires Status: GOOD
Atv # Hours Used Day: 0.2 HOURS
Atv # Notes And Comments: ALL GOOD

Summary of Engineering activities:
EVA, ENGINEERING CHECKS

Notes:
Everything looks fine from the Engineering Checks

Questions and Concerns to Mission Support
NONE

REQUESTS
NONE

Wish you the very best