Home‎ > ‎Crew 161‎ > ‎

0116-EngineeringReport

SOL 7

ENGINEERING REPORT 

Crew Engineer Name:  MIKHAIL KHMELIK

Date: 16  January 2016

Diesel – 70%
Propane – 21%
Gasoline (5 Gallon containers for ATV) –  1 FULL
Water (trailer) measured in inches from the top – 15
Water (trailer) measured in inches from the bottom – 27 IN
Water (static) measured in inches from the bottom – 30IN
Trailer to Static Pump used – NO
Water (loft) – 9
Static to Loft Pump used – YES
Water Meter: 0103468.8
Atv # Oil Checked:  YES
Atv # Fuel Used Gals: NO
Atv # Tires Status: GOOD
Atv # Hours Used Day: NONE
Atv # Notes And Comments: ATV#2 BATTERY IS DEAD

Summary of Engineering activities:
EVA, ENGINEERING CHECKS, PICKED UP MISSING CREW MEMBER


Notes:
EVERYTHING LOOKS FINE FROM THE ENGINEERING CHECKS.      


Questions and Concerns to Mission Support:
ATV#2 BATTERY IS DEAD. LOOKS LIKE IT WAS DEAD FOR A WHILE. HAVE TO CHECK HOW TO RECHARGE IT. ALL OTHER ATVS ARE GOOD.


Requests:
 WATER FILTER FOR DRINKING WATER EXPIRING. WOULD BE NICE TO HAVE A REPLACEMENT.