MISSION SUPPORT

SOL 7

ENGINEERING REPORT 

Crew Engineer Name:  MIKHAIL KHMELIK

Date: 17  January 2016

Diesel – 70%
Propane – 20%
Gasoline (5 Gallon containers for ATV) –  1-1/4 FULL
Water (trailer) measured in inches from the top – 15
Water (trailer) measured in inches from the bottom – 27 IN
Water (static) measured in inches from the bottom – 29 IN
Trailer to Static Pump used – NO
Water (loft) – 9
Static to Loft Pump used – YES
Water Meter: 0103499.2
Atv # Oil Checked:  NO
Atv # Fuel Used Gals: 0.5 GALLON
Atv # Tires Status: GOOD
Atv # Hours Used Day: 1 HOUR
Atv # Notes And Comments: ALL GOOD

Summary of Engineering activities:
EVA, ENGINEERING CHECKS, ATVs REFILLED

Notes:
EVERYTHING LOOKS FINE FROM THE ENGINEERING CHECKS.

Questions and Concerns to Mission Support:
NONE

Requests:
NONE