SOL 9

ENGINEERING REPORT 

Crew Engineer Name:  MIKHAIL KHMELIK

Date: 18  January 2016

Diesel – 70%
Propane – 20%
Gasoline (5 Gallon containers for ATV) –  1-1/4 FULL
Water (trailer) measured in inches from the top – 15
Water (trailer) measured in inches from the bottom – 27 IN
Water (static) measured in inches from the bottom – 27 IN
Trailer to Static Pump used – NO
Water (loft) – 9
Static to Loft Pump used – YES
Water Meter: 0103532.8
Atv # Oil Checked:  NO
Atv # Fuel Used Gals: NONE
Atv # Tires Status: GOOD
Atv # Hours Used Day: NONE
Atv # Notes And Comments: ALL GOOD

Summary of Engineering activities:
ENGINEERING CHECKS

Notes:
EVERYTHING LOOKS FINE FROM THE ENGINEERING CHECKS.

Questions and Concerns to Mission Support:
NONE

Requests:
NONE