SOL 12

ENGINEERING REPORT 

Crew Engineer Name:  MD MAHBUBUR RAHMAN

Date: 21 January 2016

Diesel – 69%
Propane – 19%
Gasoline (5 Gallon containers for ATV) –  1-1/4 FULL
Water (trailer) measured in inches from the top – 30
Water (trailer) measured in inches from the bottom – 12 IN
Water (static) measured in inches from the bottom – 34 IN
Trailer to Static Pump used – YES
Water (loft) – 9
Static to Loft Pump used – YES
Water Meter: 0103685.6
Atv # Oil Checked:  NO
Atv # Fuel Used Gals: 0.3 GALLON
Atv # Tires Status: GOOD
Atv # Hours Used Day: 25 minutes
Atv # Notes And Comments: ALL GOOD

Summary of Engineering activities:
EVA, ENGINEERING CHECKS

Notes:
EVERYTHING LOOKS FINE FROM THE ENGINEERING CHECKS.
           
Questions and Concerns to Mission Support:
THE WATER LEVEL IN TRAILER IS GETTING LOW. WE WILL BE FINE UNTIL THE END OF OUR MISSION, BUT NEXT CREW WILL NEED IT VERY SOON.

Requests:
NONE