SOL 14

ENGINEERING REPORT 

Crew Engineer Name:  MIKHAIL KHMELIK

Date: 23 January 2016

Diesel – 69%
Propane – 15%
Gasoline (5 Gallon containers for ATV) –  2 FULL
Water (trailer) measured in inches from the top – 30
Water (trailer) measured in inches from the bottom – 12 IN
Water (static) measured in inches from the bottom – 29 IN
Trailer to Static Pump used – N)
Water (loft) – 9
Static to Loft Pump used – YES
Water Meter: 0103837.2
Atv # Oil Checked:  NO
Atv # Fuel Used Gals: NONE
Atv # Tires Status: GOOD
Atv # Hours Used Day: NONE
Atv # Notes And Comments: ALL GOOD

Summary of Engineering activities:
ENGINEERING CHECKS, TRAINING.

Notes:
EVERYTHING LOOKS FINE FROM THE ENGINEERING CHECKS.
NOTE PROPANE LEVEL!
THERE ARE 5 WORKING AND CHARGEABLE SUITS IN THE HAB.

Questions and Concerns to Mission Support:
LOOKS LIKE THERE IS A LEAK OF WASTE WATER FROM THE SHOWER. THE RESTROOM LOOK FINE. I WILL SEND PHOTOS TOMORROW.

Requests:
NONE