ENGINEERING REPORT SOL #6

Date: 29 Jan 2016
Crew Engineer Name: Anderson Wilder

Diesel – 50% (It’s hard to keep an accurate number because I stand so
far below the needle)
Propane – 85%
Gasoline (5 Gallon containers for ATV) – 10 Gallons
Water (trailer) measured in inches from the top– topped off
Water (static) measured in inches from the bottom – 30
Trailer to Static Pump used – No
Water (loft) – 11
Static to Loft Pump used – Yes, used this morning instead of last night
Water Meter: 104,038.0
Atv # 1,3,5 Oil Checked: Good
Atv # 1,3,5 Fuel Used Gals: Unknown
Atv # 1,3,5 Tires Status: Good
Atv Hours Used Day: 0 hr

Atv Notes And Comments: ATV #1 is out of commission as of right now, so
all that we have operational is ATV #3 and 5 at this moment

Summary of Engineering activities: Went through basic engineering report
procedures, everything is good

Notes: N/A

Questions and Concerns to Mission Support
N/A

REQUESTS
N/A