ENGINEERING REPORT  SOL #9

Date: 01 Feb 2016
Crew Engineer Name: Anderson Wilder

Diesel –  50% (It’s hard to keep an accurate number because I stand so far
below the needle)
Propane – 81%
Gasoline (5 Gallon containers for ATV) – 10 Gallons
Water (trailer) measured in inches from the top– topped off
Water (static) measured in inches from the bottom – 25.5
Trailer to Static Pump used – No
Water (loft) –  12
Static to Loft Pump used – Yes, topped it off
Water Meter: 104,099.0
Atv # 1,3,5 Oil Checked:  Good
Atv # 1,3,5 Fuel Used Gals:  Unknown
Atv # 1,3,5 Tires Status:   Good
Atv  Hours Used Day: 20-30 mins on 1 and 3

Atv  Notes And Comments: ATV #1 is out of commission as of right now, so
all that we have operational is ATV #3 and 5 at this moment.  Battery to
ATV #4 is very likely dead, charging it did not make a noticeable
difference.  Ran #1 and #3 for about 10-15 mins a piece and then rode
around for a few mins. #5 did not make it through the night so I brought in
its battery to charge it, it’ll probably be touch and go though

Summary of Engineering activities: Went through basic engineering report
procedures, everything is good

Notes:
N/A

Questions and Concerns to Mission Support:
N/A

REQUESTS:
N/A