Home‎ > ‎Crew 164‎ > ‎

0304-EngineeringReport

Engineering Report 164.12
------------------------------
--------------------------------------------------
Engineering Report
--------------------------------------------------------------------------------
Date:  03/04/2016 at 6:00p.m.

Crew Engineer Name: Louis Maller

Diesel – 100%

Propane – 50%

Gasoline (5 Gallon containers for ATV) –  two empty containers

Water (trailer) measured in cm from the bottom–    19in / 42in i.e.
48cm/106.6cm from the bottom

Water (static) measured in cm from the top – 27in / 42in i.e.
68.6cm/106.6cm from the top

Trailer to Static Pump used – 0in i.e. 0cm

Water (loft) – 30 gallons i.e. 113.56 liters

Static to Loft Pump used – 50 gallons i.e. 189.3 liters

Water Meter: 105 459.1 gallons

Atv # Oil Checked:  all ATVs full

Atv # Fuel Used Gals: None, all ATVs refueled

Atv # Tires Status:  No tire problems

Atv # Hours Used Day: Not used

Atv # Notes and Comments: None

Summary of Engineering activities:
Engineering check during morning EVA.

Questions and Concerns to Mission Support:
None, the Hab and all material are in working order, apart from the
backpack battery shortage Camille already sent a mail about, and which
is being taken care of.

Cheers,
Louis Maller
Crew Engineer for MDRS Supaero Crew 164