Home‎ > ‎Crew 165‎ > ‎

0310-EngineeringReport

 Date:  03/10/2016 at 6:00p.m.
 Crew Engineer Name: Eriko Moriyama & Masashi Hiraki
 Diesel – 77%
 Propane – 47%
 Gasoline (5 Gallon containers for ATV) –  2 empty containers
 Water (trailer) measured in cm from the bottom–   11in / 42in i.e. 27.9cm/106.6cm
 Water (static) measured in cm from the top – 6in / 42in i.e. 15.2cm/106.6cm
 Trailer to Static Pump used – 28.5in i.e. 72.4cm
 Water (loft) –  48gallons
 Static to Loft Pump used – 24gallons
 Water Meter: 105,799.7

 Summary of Engineering activities: We are so happy for refilled water!!

 Questions and Concerns to Mission Support:
 Toilet: Thank you for toilet manual, we will try to check flush valve tomorrow.
 Fuse: We searched for fuses inside toolbox, shelves and other places in Hab, but we could not find it.
 ATV: Ken repaired ATV#4’s parking brake when we were in EVA. I am attaching a photo.
 Water: Thank you for refilling the trailer tank. Everyone cannot wait to take a shower.
 Gasoline: we are still waiting.