Hello Mission Support,
Here's the engineer's report, have a good evening:

Date:  03/29/2016 at 6:30p.m.
Crew Engineer Name: Gregory Edison

Diesel – 52%
Propane – 37%
Gasoline (5 Gallon containers for ATV) –  2 full containers
Water (trailer) measured in cm from the bottom–   28in / 42in
Water (static) measured in cm from the bottom – 30in / 42in
Trailer to Static Pump used – No
Water (loft) – 45 gallons
Static to Loft Pump used – 31 gallons
Water Meter: 106705,1 gallons

Summary of Engineering activities: Routine check. Used the electric
tape to fix power on rover. Works fine now, no short-circuit.
Questions and Concerns to Mission Support:
Power: Still on the Cat.  The sensor arrived, DG installed it, still something
wrong.  Down for 5 minutes at 5 pm.  Added three quarts of oil.