Home‎ > ‎Crew 166‎ > ‎

0326-EngineeringReport

Hey Mission Support,
Here's my report:

Date:  03/26/2016 at 5:20p.m.
Crew Engineer Name: Gregory Edison

Diesel – 60%
Propane – 39%
Gasoline (5 Gallon containers for ATV) –  1 full container, 1/5 of a container
Water (trailer) measured in cm from the bottom–   28in / 42in
Water (static) measured in cm from the bottom – 42in / 42in
Trailer to Static Pump used – Yes
Water (loft) – 48 gallons
Static to Loft Pump used – 55 gallons
Water Meter: 106577,9 gallons

Summary of Engineering activities: Routine check.

Questions and Concerns to Mission Support: No concerns, everything is
going smoothly.

Power: Still on Cat.  Down 5 min at 5 pm.  Added 2 quarts of oil.
Note: The Cat has a known slow diesel leak, probably 1 L has leaked onto the
floor of the generator shed since we switched generators.