Good day, Mission Support,

Date: 05APR2016 at 7:31 PM
Crew Engineer Name: Jonathan Beechner

Diesel – 50%
Propane – 35%
Gasoline (5 Gallon containers for ATV) –  1 half full container, 1 container full of diesel

Water (trailer) measured in cm from the bottom –  12in / 42in
Water (static) measured in cm from the bottom – 21.5in / 42in
Trailer to Static Pump used – No
Water (loft) – 47 gallons
Static to Loft Pump used – 60 gallons
Water Meter: 107186,5 gallons

Summary of Engineering activities: Routine check, filled the ATV's with gas, filled ATV #1 with oil.
Questions and Concerns to Mission Support: One of the gasoline containers was mistakenly replenished with diesel. This cannot be used on the ATV’s. Please advise how to replenish the container with gasoline.
Power: Shannon cut the power at 10:00 AM and turned it back on shortly after. Presumably still on cat.

Jonathan Beechner
Crew Engineer