Good day, Mission Support,

Date: 07APR2016 at 7:08 PM
Crew Engineer Name: Jonathan Beechner

Diesel – 50%
Propane – 35%
Gasoline (5 Gallon containers for ATV) –  1 full container, 1 half full container

Water (trailer) measured in cm from the bottom –  42in / 42in
Water (static) measured in cm from the bottom – 18in / 42in
Trailer to Static Pump used – No
Water (loft) – 47 gallons
Static to Loft Pump used – 81 gallons
Water Meter: 107379,0 gallons

Summary of Engineering activities: Routine check, trailer was returned by D. G., repaired air pack (battery was not connected to main circuit).
Questions and Concerns to Mission Support: No
Power: Power reset at 5:00 PM, no oil added, still on cat.

Jonathan Beechner
Crew Engineer