









 |
    
|
Log Book for February 19, 2004
Commander's Check-In
Digby Tarvin Reporting
Crew Physical Status: All crew members are now fit and healthy, with excellent morale.
Brief Narrative of Mission Results: The main activity was an extended ATV mounted geological and geophysical EVA to Chluda Pass, preceeded by an engineering EVA to effect repairs on a non-functional ATV, and concluding with an engineering EVA with restored operation to the grey water recycling system. In addition, we were paid a visit by two representatives of the Finnish Broadcasting Company, who filmed both the ATV repair and part of the ATV EVA, as well as our preparations and two crew interviews.
Plans for Tomorrow: Tomorrow we plan to start the 3D terrain mapping experiment, and continue to extend the coverage of the geological and geophysical surveys.
Report Transmission Schedule: The reports that are going to be sent this evening will be
- This check-in report.
- Commander's Report.
- 2 x EVA Reports.
- Geology Report.
- Journalists report.
- Engineering Report.
- Green Hab Report.
The reports will be submitted by 20:30 this evening.
Inventory: Main hab water supply has now been resupplied.
Support Requested: Spare parts are required to effect more permanent repair to the ATVs, as detailed in the engineering report.
|
|
|