Log Book for March 30, 2004
Engineering Report
James Russell Reporting
Generator/Electricity:
China Special:
Voltage: 222
Hobbs meter reading: 484.3
We have been refueling China Special while it is still running.
Maintenance:
Oil Quantity remaining: 2.5 quarts
Per Mission Support, more oil to arrive soon.
Fuel Status:
- Diesel:
Quantity: 41.75 gallons remaining
Consumed: 7.25 gallons
- Propane Tank:
Reading: 75% (187.5 gal/250gal)
Consumed: 2.5 gallons
- Gasoline:
Quantity: 42.5 gallons
Consumed: 0 gallons
Water:
Reading: Outside potable water tank level: 73 cm from the base
Consumed: 19.5 gallons in last 24 hours
Time: 09:50
Inside Tank: 30 gallons
(Previous reading at 3/29/04 1800, 37 gallons.)
Time: 12:58
Inside Tank: 29 gallons
Time: 19:58
Inside Tank: 17.5 gallons
HVAC: Nothing to report.
Transport: Nothing new to report.
Mars-Suits: Equipment Checkout Continued from 03/29/2004
Crew 26 organized the EVA suit up area.
Crew 27 is now going to complete an equipment checkout
Radios: Ear pieces checked with each radio; then arranged in order of quality so when on EVA people can take the best ones.
|
|
|