Log Book for April 2, 2004
Engineering Report
James Russell & Peter Collins Reporting
Generator/Electricity:
China Special:
Voltage: 220
Hobbs meter reading: 554
We have been refueling "China Special" while it is still running.
Fuel Status:
Diesel
- Quantity: 23 gallons remaining
- Consumed: 5.5 gallons
Propane Tank:
- Reading: 75% (187.5 gal)
- Consumed: 0 gallons
Gasoline:
Quantity: 42.5 gallons
- Consumed: 0 gallons
Oil:
- Quantity remaining: 13.5 quarts
Water:
Reading: Outside potable water tank level: 60 cm from the base
Consumed: 25 gallons in last 24 hours
Estimated Grey Water Used: 20 gallons in last 24 hours (assumed 80%)
Time: 08:00
Inside Tank: 23 gallons
(Previous reading at 04/01/04: 30 gallons)
Time: 13:12
Inside Tank: 10 gallons
Time: 14:00
Inside Tank: 55 gallons (refilled)
Time: 19:40
Inside Tank: 50 gallons
HVAC: Nothing to report.
Transport: Nothing new to report.
Mars-Suits: Nothing new to report.
Computers/Networking Infrastructure: Nothing new to report.
|
|
|