Log Book for April 5, 2004
Engineering Report
James Russell & Peter Collins Reporting
Generator/Electricity:
China Special:
Voltage: 220
Hobbs meter reading: 625
We have been refueling "China Special" while it is still running.
Fuel Status:
Diesel:
Quantity: 8 gallons remaining
Consumed: 5 gallons
Both drums were fully emptied today
Propane Tank:
Reading: 75% (187.5 gal)
Consumed: 0 gallons
Gasoline:
Quantity: 35 gallons
Consumed: 5.5 gallons
Oil:
Quantity remaining: 12.5 quarts
Water:
Reading: Outside potable water tank level: 40 cm from the base
Consumed: 25 gallons in last 24 hours
Estimated Grey Water Used: 20 gallons in last 24 hours (assumed 80%)
Time: 20:35
Inside Tank: 25 gallons
(Previous reading at 04/04/04: 50 gallons)
HVAC: Nothing to report.
Transport: Nothing new to report.
Mars-Suits: Nothing new to report.
Computers/Networking Infrastructure: Nothing new to report.
|
|
|