








 |
    
Log Book for February 4, 2008
Commander's Check-In
John Thaler Reporting
Crew Physical Status:
Warming up after a brisk, cold afternoon excursion and enjoying a warm
supper.
Time Departed/Returned from EVA:
EVA 02:
Depart 15:00
Return 18:00
Brief Narrative of Field Mission Results:
EVA was not "in Sim" but was a training exercise in geology and biology
field procedures and an introduction to using GPS.
EVA Data/Interpretations:
N/A
Hab Maintenance:
GreenHab tank aerators were turned on today for the first time in a few
days. Skirt secured to Hab. Trench beside GreenHab drained of water.
Water pipe on engineering area water tank re-wrapped with heating tape.
Report Transmission Schedule:
Reports to be expected by 21:00:
Commander
Engineering
3 x Special Science Reports
Journalist
Plans for Tomorrow:
Begin full simulation. Morning EVA to test geology project equipment.
Afternoon ATV EVA depending on gasoline supplies.
Inventory:
Food supplies are full. Water supplies sufficient. Gasoline 5 gal.
Support Requested:
Request gasoline. Request instructions regarding GreenHab grey water
pump.
|
|
|