Log Book for February 11, 2008
Special Science Report
Kerry Cupit Reporting
Project:
Soil Gas Analysis at MDRS as a Rapid Resource and Geologic Assessment
Tool
Personnel:
Kerry Cupit
Operations Data Collected:
Another successful EVA (EVA-17) resulted in 4 holes being drilled and
sampled. All holes were drilled with ease to the optimal depth of 3ft,
and all crew members have now experienced soil gas sampling techniques.
3-4cm thick gypsum crystals were sampled from Mid Ridge Planitia, which
will be cleaned up and examined after soil gas sampling is complete.
------HOLE 14------
Date: Feb 11, 2008
Time: 12:00
Depth: 96cm
Easting: 0515543
Northing: 4253476
[CH4]: 0.0%
[CO2]: 0.0%
[O2]: 20.4%
[H2]: low
[CO]: 4ppm
[H2S]: 0ppm
Downhole T: 10.5°
Barometric P: 25.48mmHg
Comments:
------HOLE 15------
Date: Feb 11, 2008
Time: 11:30
Depth: 91cm
Easting: 0515639
Northing: 4253447
[CH4]: 0.0%
[CO2]: 0.1%
[O2]: 20.6%
[H2]: low
[CO]: 2ppm
[H2S]: 0ppm
Downhole T: 10.1°
Barometric P: 25.51mmHg
Comments: LEL CH4 ~ 0.1%
------HOLE 17------
Date: Feb 11, 2008
Time: 12:15
Depth: 90cm
Easting: 0515516
Northing: 4253391
[CH4]: 0.0%
[CO2]: 0.1%
[O2]: 20.4%
[H2]: low
[CO]: 0ppm
[H2S]: 0ppm
Downhole T: 12.5°
Barometric P: 25.46mmHg
Comments:
------HOLE 18------
Date: Feb 11, 2008
Time: 12:35
Depth: 91cm
Easting: 0515606
Northing: 4253349
[CH4]: 0.0%
[CO2]: 0.0%
[O2]: 20.6%
[H2]: low
[CO]: 0ppm
[H2S]: 0ppm
Downhole T: 12.0°
Barometric P: 25.46 mmHg
Comments: Some [CO] ppm
Technical/Equipment Issues:
All equipment worked optimally, no issues to report.
Discussion:
4 of 18 holes remain to be drilled. I fully expect these to be
completed by tomorrow.
After drilling is complete, data analysis can begin. Additionally,
there are some samples at hab to analyze and catalogue.
If time permits, an inventory of geology equipment at MDRS will be
performed for Mission Support.
Questions for RST:
None at this time.
|
|
|