Log Book for January 28, 2010
EVA Report
Mike Moran Reporting

EVA #10 Report

January 28, 2010

Mike Moran

Time:
1545 - 1716

Crew Members:
Carla Haroz and Mike Moran

Site Location:
Radio telescope and rover docking bay

Transit Mode:
Walking

Objectives:
Lengthen coaxial cables connecting the power combiner to both the south
antenna and the Hab, raise the south antenna to 19.5-foot height,
re-secure guy lines to all towers, test dexterity of gloves in winter
conditions

Lessons Learned:
Radio telescope should only be raised/lowered in fair weather
conditions, interior pole holes should be re-drilled (potentially when
switched for longer PVC pipes), snow-martians made near the Hab are
prone to falling over