Log Book for January 28, 2010
EVA Report
Mike Moran Reporting
EVA #10 Report
January 28, 2010
Mike Moran
Time: 1545 - 1716
Crew Members: Carla Haroz and Mike Moran
Site Location: Radio telescope and rover docking bay
Transit Mode: Walking
Objectives: Lengthen coaxial cables connecting the power combiner to both the south antenna and the Hab, raise the south antenna to 19.5-foot height, re-secure guy lines to all towers, test dexterity of gloves in winter conditions
Lessons Learned: Radio telescope should only be raised/lowered in fair weather conditions, interior pole holes should be re-drilled (potentially when switched for longer PVC pipes), snow-martians made near the Hab are prone to falling over
|